Concrete Batching Plant Installation Guide: Step-by-Step Instructions from China Manufacturer
Introduction
Proper installation is essential for the stable operation and long service life of a concrete batching plant.
Incorrect installation can lead to low production efficiency, frequent breakdowns, and high maintenance costs.
As a professional concrete batching plant manufacturer in China, this guide explains the complete installation process and key points you should know before starting your project.
Contact us to get installation guidance and a customized batching plant solution.
Step 1: Site Preparation
Before installation, the construction site must be properly prepared.
Key requirements include:
-
Flat and solid ground
-
Sufficient space for material storage and truck movement
-
Easy access for power and water supply
-
Drainage system to prevent water accumulation
A well-prepared site reduces installation time and future operational issues.
Step 2: Foundation Construction
For stationary concrete batching plants, a concrete foundation is usually required.
Foundation considerations:
-
Load-bearing capacity
-
Equipment layout drawing
-
Anchor bolt positioning
-
Local soil conditions
Mobile concrete batching plants usually require minimal or no foundation, which significantly shortens installation time.
Step 3: Equipment Installation
Main equipment installation includes:
-
Aggregate batching system
-
Conveyor belts
-
Weighing systems
-
Control room and control system
All components should be installed according to the manufacturer’s layout drawing.
Step 4: Electrical and Control System Setup
Electrical installation is a critical step.
Key points:
-
Correct power supply (380V / 415V / 440V)
-
Proper grounding
-
Control cabinet installation
-
Cable protection
A fully automatic control system helps improve production accuracy and efficiency.
Step 5: Commissioning and Trial Operation
After installation, the plant must be tested before formal production.
Commissioning includes:
-
No-load test
-
Load test
-
Calibration of weighing systems
-
Safety inspection
Only after successful testing should the batching plant be put into operation.
Installation Time Reference
| Plant Type | Installation Time |
|---|---|
| Mobile batching plant | 1–2 days |
| Small stationary plant | 7–10 days |
| Medium & large plant | 10–20 days |
Actual time depends on site conditions and configuration.
Common Installation Mistakes to Avoid
-
Poor foundation quality
-
Incorrect power connection
-
Improper alignment of equipment
-
Skipping commissioning steps
Choosing an experienced manufacturer helps avoid these problems.
Why Choose Manufacturer Installation Support?
A professional manufacturer provides:
-
Layout drawing
-
Installation guidance
-
Online or on-site technical support
-
Operator training
-
Long-term after-sales service
This ensures stable operation and reduces long-term maintenance costs.

Get Professional Installation Support
To get installation guidance and a quotation, please provide:
-
Project country
-
Plant type and capacity
-
Power supply standard
-
Project schedule
Contact us now to get a Concrete Batching Plant Installation Guide